Case study

Back Online in Record Time

A leading U.S. paper manufacturer needed to restart a decommissioned mill and increase kraft pulp production from 150,000 to 270,000 metric tons fast. Their vacuum pump fleet had been idle and was in poor condition, creating a major risk to the restart timeline. 

They turned to Nash. 

In just weeks, Nash’s certified service center in Moody, Alabama restored five vacuum pumps, including obsolete equipment to OEM specifications, delivering 95% of new-pump performance. The mill reopened on schedule; production scaled successfully, and the local economy saw renewed investment. 

This case study demonstrates how fast, reliable service can deliver measurable operational results. 